Full metadata record
DC FieldValueLanguage
dc.contributor.author王興文en_US
dc.contributor.authorWang, Sheng-Wenen_US
dc.contributor.author唐佩忠en_US
dc.contributor.authorPei-Chong Tangen_US
dc.date.accessioned2014-12-12T02:15:03Z-
dc.date.available2014-12-12T02:15:03Z-
dc.date.issued1995en_US
dc.identifier.urihttp://140.113.39.130/cdrfb3/record/nctu/#NT840327069en_US
dc.identifier.urihttp://hdl.handle.net/11536/60329-
dc.description.abstractWhen buliding a flexible manufacturing system, first and most important step is to link each machine hardware interface through network. Then the second is to arrange the order of task for best performance of operation .The period of developing a whole flexible manufacturing system always latesserval years . If there are no good planing , the period may lates much longer and more money spends. For a software engineer, there are toozh_TW
dc.language.isozh_TWen_US
dc.subject彈性製造系統zh_TW
dc.subject網路zh_TW
dc.subject物件導向zh_TW
dc.subjectTCP/IPen_US
dc.subjectTCP/IPen_US
dc.subjectFMSen_US
dc.subjectnetworken_US
dc.subjectobject-orienteden_US
dc.title以TCP/IP通訊協定為基礎之彈性製造模擬系統zh_TW
dc.titleThe Planing and Design of a Prototype TCP/IP Based Flexible Manufacturing Simulation Systemen_US
dc.typeThesisen_US
dc.contributor.department電控工程研究所zh_TW
Appears in Collections:Thesis