Full metadata record
DC FieldValueLanguage
dc.contributor.author毛健平en_US
dc.contributor.authorJan-Ping Maoen_US
dc.contributor.author葉克家en_US
dc.contributor.authorKeh-Chia Yehen_US
dc.date.accessioned2014-12-12T02:19:51Z-
dc.date.available2014-12-12T02:19:51Z-
dc.date.issued1998en_US
dc.identifier.urihttp://140.113.39.130/cdrfb3/record/nctu/#NT870015025en_US
dc.identifier.urihttp://hdl.handle.net/11536/63726-
dc.description.abstract本研究目的藉由一系列實驗探討採砂坑之沖淤行為,這些結果將被提供於採砂之機制中作為參考。本試驗利用因次分析得到之經驗式,以不同之邊界條件、流量模擬之。由實驗數據獲得各階段坑深、坑速之經驗公式。除此之外,不受回水影響之情況下,改變下游邊界條件將不影響採沙坑之運移,實驗將於採沙坑消失結束而停止。zh_TW
dc.description.abstractThe purpose of this study is to investigate the scouring and deposition behavior of the sand mining pits through a series of experiments. These results will then provide useful information for the channel mining operations. Dimensional analysis was performed and experiments were conducted accordingly. Several different boundary conditions, water discharges were used in the experiments. Based on the experimental results, empirical formulas for pit height and pit velocity were obtained. Besides these, the change of down boundary conditions in the experiments will not significantly influence the migration of the mining pit. The experiments were terminated till the filling up of the pits are reached.en_US
dc.language.isozh_TWen_US
dc.subject採砂坑zh_TW
dc.subjectpiten_US
dc.title採沙坑運移之實驗研究zh_TW
dc.titleAn Experimental Study on Mining Pit Migrationen_US
dc.typeThesisen_US
dc.contributor.department土木工程學系zh_TW
Appears in Collections:Thesis