標題: | A GA methodology for the scheduling of yarn-dyed textile production |
作者: | Hsu, Hsi-Mei Hsiung, Yai Chen, Ying-Zhi Wu, Muh-Cherng 工業工程與管理學系 Department of Industrial Engineering and Management |
關鍵字: | Scheduling;Sequence-dependent setup;Multi-stage;Textile;Genetic algorithm;Group-delivery |
公開日期: | 1-十二月-2009 |
摘要: | This paper presents a scheduling approach for yarn-dyed textile manufacturing. The scheduling problem is distinct in having four characteristics: multi-stage production, sequence-dependent setup times, hierarchical product structure, and group-delivery (a group of jobs pertaining to a particular customer order must be delivered together), which are seldom addressed as a whole in literature. The scheduling objective is to minimize the total tardiness of customer orders. The problem is formulated as a mixed integer programming (MIP) model, which is computationally extensive. To reduce the problem complexity, we decomposed the scheduling problem into a sequence of sub-problems. Each sub-problem is solved by a genetic algorithm (CA), and an iteration of solving the whole sequence of sub-problems is repeated until a satisfactory Solution has been obtained. Numerical experiment results indicated that the proposed approach significantly outperforms the EDD (earliest due date) scheduling method-currently used in the yarn-dyed textile industry. (C) 2009 Elsevier Ltd. All rights reserved. |
URI: | http://dx.doi.org/10.1016/j.eswa.2009.04.075 http://hdl.handle.net/11536/6391 |
ISSN: | 0957-4174 |
DOI: | 10.1016/j.eswa.2009.04.075 |
期刊: | EXPERT SYSTEMS WITH APPLICATIONS |
Volume: | 36 |
Issue: | 10 |
起始頁: | 12095 |
結束頁: | 12103 |
顯示於類別: | 期刊論文 |