標題: | Optimal management of the machine repair problem with working vacation: Newton's method |
作者: | Wang, Kuo-Hsiung Chen, Wei-Lun Yang, Dong-Yuh 工業工程與管理學系 Department of Industrial Engineering and Management |
關鍵字: | Cost;Optimization;Working vacation;Newton's method |
公開日期: | 15-十一月-2009 |
摘要: | This paper studies the M/M/1 machine repair problem with working vacation in which the server works with different repair rates rather than completely terminating the repair during a vacation period. We assume that the server begins the working vacation when the system is empty. The failure times, repair times, and vacation times are all assumed to be exponentially distributed. We use the MAPLE software to compute steady-state probabilities and several system performance measures. A cost model is derived to determine the optimal values of the number of operating machines and two different repair rates simultaneously, and maintain the system availability at a certain level. We use the direct search method and Newton's method for unconstrained optimization to repeatedly find the global minimum value until the system availability constraint is satisfied. Some numerical examples are provided to illustrate Newton's method. (C) 2009 Published by Elsevier B.V. |
URI: | http://dx.doi.org/10.1016/j.cam.2009.07.043 http://hdl.handle.net/11536/6424 |
ISSN: | 0377-0427 |
DOI: | 10.1016/j.cam.2009.07.043 |
期刊: | JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS |
Volume: | 233 |
Issue: | 2 |
起始頁: | 449 |
結束頁: | 458 |
顯示於類別: | 期刊論文 |