dc.description.abstractThe liquid crystal display module scheduling problem (LCMSP) is a variation of the classical parallel machines scheduling problem, which has many real-world applications, particular, in the thin film transistor liquid crystal display (TFT-LCD) manufacturing industry. In this paper, we present a case study on the LCMSP, which is taken from a final liquid crystal display module (LCM) shop floor in a TFT-LCD industry. For the case we investigated, the jobs are clustered by their product types and the machine setup time is sequentially dependent on the product types of the jobs processed on the machine. In LCMSP, the objective is to maximize the total profit subject to fulfilling contracted quantities without violating the due date and machine capacity restrictions. The LCMSP can be modelled as a multi-level optimization problem. The sub-problem of LCMSP can be transformed into the vehicle routing problem with time window (VRPTW). One can therefore solve the LCMSP efficiently using existing VRPTW algorithms. We present two new algorithms based on the savings algorithms with some modifications to accommodate the LCMSP. Based on the characteristics of the LCM process, a set of test problems is generated covering most of the real-world applications for test purposes. Computational results and performance comparisons show that the proposed algorithms solved the LCMSP efficiently and near-optimally. Journal of the Operational Research Society (2009) 60, 921-933. doi:10.1057/palgrave.jors.2602604en_US
dc.language.isoen_USen_US
dc.subjectparallel machines schedulingen_US
dc.subjectprofiten_US
dc.subjectsequence dependence setup timeen_US
dc.titleFast and effective algorithms for the liquid crystal display module (LCM) scheduling problem with sequence-dependent setup timeen_US
dc.typeArticleen_US
dc.identifier.doi10.1057/palgrave.jors.2602604en_US
dc.identifier.journalJOURNAL OF THE OPERATIONAL RESEARCH SOCIETYen_US
dc.citation.volume60en_US
dc.citation.issue7en_US
dc.citation.spage921en_US
dc.citation.epage933en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:000266777300004-
dc.citation.woscount1-
顯示於類別:期刊論文


文件中的檔案:

  1. 000266777300004.pdf

若為 zip 檔案,請下載檔案解壓縮後,用瀏覽器開啟資料夾中的 index.html 瀏覽全文。