dc.contributor.author | 吳玫慧 | en_US |
dc.contributor.author | Wu, Mei-Hui | en_US |
dc.contributor.author | 巫木誠 | en_US |
dc.contributor.author | Wu, Muh-Cherng | en_US |
dc.date.accessioned | 2014-12-12T02:39:46Z | - |
dc.date.available | 2014-12-12T02:39:46Z | - |
dc.date.issued | 2013 | en_US |
dc.identifier.uri | http://140.113.39.130/cdrfb3/record/nctu/#GT070063318 | en_US |
dc.identifier.uri | http://hdl.handle.net/11536/74087 | - |
dc.description.abstract | 本論文以半導體晶圓製造廠為對象,針對同時存在訂單式生產與庫存式生產模式的日投料決策進行研究,此決策目的主要在使瓶頸機台的每日在製品需求變異最小化,以降低產品生產週期時間的變異。本研究發展出四種投料方法(M-1、M-2、M-3、M-4)後,以Flexsim模擬軟體建立模型進行實驗,並利用ANOVA對模擬結果進行分析。其分析結果指出M-1投料方法明顯優於其他三種投料方法。 | zh_TW |
dc.description.abstract | This research studies the daily job release policy for a semiconductor wafer fab, operating in a scenario which involves both MTO (make-to-order) and MTS (make-to-stock) orders. The objective of the job release policy is to minimize the work-in-process (WIP) deviation of the bottleneck workstation, in order to reduce the deviation of cycle time. Four heuristic methods (M-1, M-2, M-3, and M-4) are developed in this study and justified by a simulation program coded in Flexsim (proprietary discrete event simulation software). Simulation results indicate that method M-1, by the ANOVA test, significantly outperforms the other three ones. | en_US |
dc.language.iso | zh_TW | en_US |
dc.subject | 晶圓廠 | zh_TW |
dc.subject | 訂單式生產 | zh_TW |
dc.subject | 庫存式生產 | zh_TW |
dc.subject | 瓶頸機台 | zh_TW |
dc.subject | 投料決策 | zh_TW |
dc.subject | semiconductor fabrication | en_US |
dc.subject | make-to-order | en_US |
dc.subject | make-to-stock | en_US |
dc.subject | bottleneck machine | en_US |
dc.subject | job release policy | en_US |
dc.title | 以瓶頸機台負荷評估晶圓廠投料決策 | zh_TW |
dc.title | A Wafer Start Policy By Loading Of Bottleneck Machine For Semiconductor Fabrication | en_US |
dc.type | Thesis | en_US |
dc.contributor.department | 管理學院工業工程與管理學程 | zh_TW |