<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css"> Skip to main content

Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory

dc.citation.epage1792en_US
dc.citation.issue2en_US
dc.citation.spage1783en_US
dc.citation.volume36en_US
dc.citation.woscount9
dc.contributor.authorKuo, Tsai-Chien_US
dc.contributor.authorChang, Sheng-Hungen_US
dc.contributor.authorHuang, Shang-Nanen_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.date.accessioned2014-12-08T15:09:50Z
dc.date.available2014-12-08T15:09:50Z
dc.date.issued2009-03-01en_US
dc.description.abstractDue-date performance is one of the most important production indexes for success utilized by wafer fabrication factories. Traditionally, the industry sets a Specific due-date tightness level and it dispatching rule based on the total processing time, the production capacity. pre-defined order release criteria and historical data, to ensure deliveries are made on-time. However, such policies typically do not solve the due-date performance problem at wafer fabrication factories, since the processes are highly complex. This investigation explores the due-date performance problem using the concept of the aggregated time buffer in critical chain project management (CCPM), which wits developed by Dr. Goldratt. A simulation model was constructed and the performance of the proposed method is evaluated based on four dispatching rules at a wafer fabrication factory. The findings reveal that applying aggregated time buffer control system improved the overall due-date control. in terms of on-time delivery rate, average tardiness, and variances in average tardiness and lateness, (C) 2008 Elsevier Ltd. All rights reserved.en_US
dc.identifier.doi10.1016/j.eswa.2007.12.038en_US
dc.identifier.issn0957-4174en_US
dc.identifier.journalEXPERT SYSTEMS WITH APPLICATIONSen_US
dc.identifier.urihttp://dx.doi.org/10.1016/j.eswa.2007.12.038en_US
dc.identifier.urihttps://ir.lib.nycu.edu.tw/handle/11536/7539
dc.identifier.wosnumberWOS:000262178000080
dc.language.isoen_USen_US
dc.subjectAggregated time bufferen_US
dc.subjectDue-date controlen_US
dc.subjectOn-time deliveryen_US
dc.subjectWafer fabricationen_US
dc.subjectTheory of constraintsen_US
dc.titleDue-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factoryen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
000262178000080.pdf
Size:
452.64 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: