<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css"> Skip to main content

Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type

Loading...
Thumbnail Image

Journal Title

Journal ISSN

Volume Title

Publisher

DOI

10.1016/j.ipl.2010.11.021

Abstract

This paper addresses the total completion time minimization in a two-stage differentiation flowshop where the sequences of jobs per type are predetermined. The two-stage differentiation flowshop consists of a stage-1 common machine and m stage-2 parallel dedicated machines. The goal is to determine an optimal interleaved processing sequence of all jobs at the first stage. We propose an O(m(2)Pi(m)(k=1)n(k)(m+1)) dynamic programming algorithm, where n(k) is the number of type-k jobs. The running time is polynomial when m is constant. (C) 2010 Elsevier B.V. All rights reserved.

Description

Citation

Endorsement

Review

Supplemented By

Referenced By