MINIMIZING THE MAKESPAN IN THE 3-MACHINE ASSEMBLY-TYPE FLOWSHOP SCHEDULING PROBLEM
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
DOI
Abstract
This paper considers minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. After problem formulation, we present a proof to show that the general version of this problem is strongly NP-complete. We then discuss a few polynomially solvable cases of the problem and present the solution algorithms. Next, a branch and bound solution scheme is suggested. Finally, three heuristics to find approximate solutions to the general problem are proposed and their error bounds are analyzed.