A note on parallel-machine scheduling with deteriorating jobs
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
DOI
10.1057/palgrave.jors.2602208
Abstract
We consider a parallel-machine scheduling problem of minimizing the total completion time. The processing time of a job is a linear function of its starting time and deterioration rate. This problem is known to be NP-hard, even for the case with two machines. In this note, we generalize an existing lower bound for the two-machine case to the general case with an arbitrary number of machines. Despite the generalization concerning machine number, our bound has one extra term that makes our bound tighter than the existing one.