<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css"> Skip to main content

A two-machine flowshop problem with processing time-dependent buffer constraints-An application in multimedia presentations

dc.citation.epage1175en_US
dc.citation.issue4en_US
dc.citation.spage1158en_US
dc.citation.volume36en_US
dc.citation.woscount2
dc.contributor.authorLin, Feng-Chengen_US
dc.contributor.authorHong, Jen-Shinen_US
dc.contributor.authorLin, Bertrand M. T.en_US
dc.contributor.department資訊管理與財務金融系 註:原資管所+財金所zh_TW
dc.contributor.departmentDepartment of Information Management and Financeen_US
dc.date.accessioned2014-12-08T15:09:44Z
dc.date.available2014-12-08T15:09:44Z
dc.date.issued2009-04-01en_US
dc.description.abstractTo have a quality multimedia presentation through networks, its presentation lag needs to be controlled. One way to reduce the lag is to prefetch the media objects before their due dates. This paper explores techniques for optimizing the object sequence in a prefetch-enabled TV-like presentation. An optimal solution is the one with which the presentation lag is minimized. We formulate the problem into a two-machine flowshop scheduling problem with a single chain precedence constraint and a player-side buffer constraint. The player-side buffer is "processing time-dependent" and distinguished from the conventional item-based intermediate buffer constraints discussed in previous flowshop studies. We prove the problem to he strongly NP-hard. A branch and bound algorithm equipped with four lower bounds and an NEH-based upper bound is developed. The simulation results show that the average gaps between the overall lower bounds and the NEH-based upper bound are less than 3% for problems with a large buffer size, and less than 13% for problems with a small buffer size and high density of precedence constraints. For applications where the media objects are delivered through extremely busy servers with which only very restricted CPU resources can be allocated for computation, the CDS-based algorithm provides better sequences than the NEH-based algorithm. (C) 2008 Elsevier Ltd. All rights reserved.en_US
dc.identifier.doi10.1016/j.cor.2008.01.002en_US
dc.identifier.issn0305-0548en_US
dc.identifier.journalCOMPUTERS & OPERATIONS RESEARCHen_US
dc.identifier.urihttp://dx.doi.org/10.1016/j.cor.2008.01.002en_US
dc.identifier.urihttps://ir.lib.nycu.edu.tw/handle/11536/7449
dc.identifier.wosnumberWOS:000262843100011
dc.language.isoen_USen_US
dc.subjectMultimedia presentationen_US
dc.subjectObject sequence optimizationen_US
dc.subjectBuffer constrainten_US
dc.subjectTwo-machine flowshopen_US
dc.titleA two-machine flowshop problem with processing time-dependent buffer constraints-An application in multimedia presentationsen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
000262843100011.pdf
Size:
918.29 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: