<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css"> Skip to main content

A Novel Hybrid MCDM Procedure for Achieving Aspired Earned Value Project Performance

dc.citation.epage0en_US
dc.citation.spage0en_US
dc.citation.woscount0en_US
dc.contributor.authorChou, Shou-Yanen_US
dc.contributor.authorYu, Chien-Chouen_US
dc.contributor.authorTzeng, Gwo-Hshiungen_US
dc.contributor.department科技管理研究所zh_TW
dc.contributor.departmentInstitute of Management of Technologyen_US
dc.date.accessioned2019-04-03T06:41:50Z
dc.date.available2019-04-03T06:41:50Z
dc.date.issued2016-01-01en_US
dc.description.abstractA better-performing project gainsmore subsequent businesses. Many organizations worldwide apply an earned value management (EVM) system to monitor and control their projects' performance. However, a successful EVM application requires handling multiple interinfluenced criteria with feedback effects for decision-making and continuous improvements throughout the application life cycle. The conventional decision approaches assume that preferences between criteria are independent and put their focuses on decision-making. This study employs a hybrid multiple criteria decision-making (HMCDM) method to devise a novel procedure to fulfil the deficiencies. The proposed procedure enables us to evaluate interinfluence effects and gap indices among criteria/dimensions/alternatives and then systemize the evaluation results in a context of influential network relation map (INRM). The INRM provides managers with visual information to find a route in making application decisions, while identifying critical gaps for continuous improvements. A numerical example is presented to illustrate the applicability of the proposed procedure. The results show that, by employing the HMCDM method, the proposed procedure can provide organizations with a foundation to ensure that the aspired EVM application outcomes are achieved at different levels within an organization.en_US
dc.identifier.doi10.1155/2016/9721726en_US
dc.identifier.issn1024-123Xen_US
dc.identifier.journalMATHEMATICAL PROBLEMS IN ENGINEERINGen_US
dc.identifier.urihttp://dx.doi.org/10.1155/2016/9721726en_US
dc.identifier.urihttps://ir.lib.nycu.edu.tw/handle/11536/133997
dc.identifier.wosnumberWOS:000377885300001en_US
dc.language.isoen_USen_US
dc.titleA Novel Hybrid MCDM Procedure for Achieving Aspired Earned Value Project Performanceen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
5efc730531b65380d46bd8dd7c0f5a9e.pdf
Size:
2.31 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: