<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css"> Skip to main content

A daily production model for wafer fabrication

dc.citation.epage63en_US
dc.citation.issue1-2en_US
dc.citation.spage58en_US
dc.citation.volume23en_US
dc.citation.woscount18
dc.contributor.authorPai, PFen_US
dc.contributor.authorLee, CEen_US
dc.contributor.authorSu, THen_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.date.accessioned2014-12-08T15:39:50Z
dc.date.available2014-12-08T15:39:50Z
dc.date.issued2004-01-01en_US
dc.description.abstractThe complex process and high variation in wafer fabrication make its production management very difficult. Problems such as planned target achievement and line balancing are not unusual in the industry. Such problems reveal the importance of developing a daily production policy for wafer fabrication. Planned target achievement and line balancing are the major concerns of this investigation in developing a daily production model. This investigation divides the process of wafer fabrication into two sections, i.e., the front and the rear, according to the last sputtering operation step. In the rear section, the objective is attaining the planned output target. In the front section, the major focus is to satisfy the demand of the rear section so that the production line is balanced. Release and dispatch policies are incorporated in this study to achieve both objectives. A real-world numerical example is used as simulation data. Results show that the proposed daily production model gives a better performance in the achievement of monthly planned output but suffers a little in the performance of line balancing.en_US
dc.identifier.doi10.1007/s00170-002-1506-9en_US
dc.identifier.issn0268-3768en_US
dc.identifier.journalINTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGYen_US
dc.identifier.urihttp://dx.doi.org/10.1007/s00170-002-1506-9en_US
dc.identifier.urihttps://ir.lib.nycu.edu.tw/handle/11536/27222
dc.identifier.wosnumberWOS:000187549000007
dc.language.isoen_USen_US
dc.subjectwafer fabricationen_US
dc.subjectplanned targeten_US
dc.subjectline balancingen_US
dc.subjectcycle timeen_US
dc.titleA daily production model for wafer fabricationen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
000187549000007.pdf
Size:
289.59 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: