<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css"> Skip to main content

Batch scheduling in differentiation flow shops for makespan minimisation

Loading...
Thumbnail Image

Journal Title

Journal ISSN

Volume Title

Publisher

DOI

10.1080/00207543.2013.784418

Abstract

This paper considers a two-stage three-machine differentiation flow shop that comprises a common machine at stage 1 and two independent dedicated machines at stage 2. Two types of jobs are to be processed. All jobs must visit the stage-1 machine, and then the jobs of each type proceed to their dedicated machine for stage-2 processing. The stage-1 machine processes the jobs in batches, each of which, whenever formed, requires a constant setup time. The objective is to find a schedule that attains the minimum makespan. While the problem is strongly NP-hard, we investigate the case where the processing sequences of the two types of jobs are given and fixed. A polynomial-time dynamic programming algorithm is designed to solve this problem. We then deploy this algorithm to compute the lower bounds of the general problem.

Description

Citation

Endorsement

Review

Supplemented By

Referenced By