Flow shop non-idle scheduling and resource-constrained scheduling
| dc.citation.epage | 585 | en_US |
| dc.citation.issue | 1-2 | en_US |
| dc.citation.spage | 577 | en_US |
| dc.citation.volume | 238 | en_US |
| dc.contributor.author | Tsai, Yen-Shing | en_US |
| dc.contributor.author | Lin, Bertrand M. T. | en_US |
| dc.contributor.department | 資訊管理與財務金融系 註:原資管所+財金所 | zh_TW |
| dc.contributor.department | Department of Information Management and Finance | en_US |
| dc.date.accessioned | 2017-04-21T06:56:46Z | |
| dc.date.available | 2017-04-21T06:56:46Z | |
| dc.date.issued | 2016-03 | en_US |
| dc.description.abstract | In a two-machine flow shop, the problem seeks to select and schedule jobs such that the processing of the selected jobs does not contain any idle time. The objective is to maximize the number of selected jobs. The problem is studied in the context of a resource-constrained scheduling problem. An O(n(2)) dynamic programming algorithm is proposed. The problem becomes ordinary NP-hard when job weights are introduced. A heuristic is designed and its performance ratio is analysed to be 3. | en_US |
| dc.identifier.doi | 10.1007/s10479-015-2070-7 | en_US |
| dc.identifier.issn | 0254-5330 | en_US |
| dc.identifier.journal | ANNALS OF OPERATIONS RESEARCH | en_US |
| dc.identifier.uri | http://dx.doi.org/10.1007/s10479-015-2070-7 | en_US |
| dc.identifier.uri | https://ir.lib.nycu.edu.tw/handle/11536/133490 | |
| dc.identifier.wosnumber | WOS:000373225500024 | en_US |
| dc.language.iso | en_US | en_US |
| dc.subject | Flow shop | en_US |
| dc.subject | Resource constraints | en_US |
| dc.subject | Financial planning | en_US |
| dc.subject | Dynamic programming | en_US |
| dc.subject | Performance analysis | en_US |
| dc.title | Flow shop non-idle scheduling and resource-constrained scheduling | en_US |
Files
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed to upon submission
- Description: