<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css"> Skip to main content

Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes

dc.citation.epage5128en_US
dc.citation.issue18en_US
dc.citation.spage5109en_US
dc.citation.volume47en_US
dc.citation.woscount26
dc.contributor.authorChung, S. H.en_US
dc.contributor.authorTai, Y. T.en_US
dc.contributor.authorPearn, W. L.en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.date.accessioned2014-12-08T15:10:14Z
dc.date.available2014-12-08T15:10:14Z
dc.date.issued2009en_US
dc.description.abstractThis paper considers the parallel batch processing machine scheduling problem which involves the constraints of unequal ready times, non-identical job sizes, and batch dependent processing times in order to sequence batches on identical parallel batch processing machines with capacity restrictions. This scheduling problem is a practical generalisation of the classical parallel batch processing machine scheduling problem, which has many real-world applications, particularly, in the aging test operation of the module assembly stage in the manufacture of thin film transistor liquid crystal displays (TFT-LCD). The objective of this paper is to seek a schedule with a minimum total completion time for the parallel batch processing machine scheduling problem. A mixed integer linear programming (MILP) model is proposed to optimise the scheduling problem. In addition, to solve the MILP model more efficiently, an effective compound algorithm is proposed to determine the number of batches and to apply this number as one parameter in the MILP model in order to reduce the complexity of the problem. Finally, three efficient heuristic algorithms for solving the large-scale parallel batch processing machine scheduling problem are also provided.en_US
dc.identifier.doi10.1080/00207540802010807en_US
dc.identifier.issn0020-7543en_US
dc.identifier.journalINTERNATIONAL JOURNAL OF PRODUCTION RESEARCHen_US
dc.identifier.urihttp://dx.doi.org/10.1080/00207540802010807en_US
dc.identifier.urihttps://ir.lib.nycu.edu.tw/handle/11536/7807
dc.identifier.wosnumberWOS:000272946800008
dc.language.isoen_USen_US
dc.subjectparallel batchen_US
dc.subjectschedulingen_US
dc.subjectunequal ready timeen_US
dc.titleMinimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizesen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
000272946800008.pdf
Size:
214.54 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: