Browsing by Author Li, RK

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 1 to 20 of 23  next >
Issue DateTitleAuthor(s)
2002Capability evaluation of a product family for processes of the larger-the-better typeChen, KS; Li, RK; Liao, SJ; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Apr-1998Constraint time buffer determination modelTu, YM; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
15-Apr-1999The construction of production performance prediction system for semiconductor manufacturing with artificial neural networksHuang, CL; Huang, YH; Chang, TY; Chang, SH; Chung, CH; Huang, DT; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Sep-2005Contract manufacturer selection by using the process incapability index C-ppChen, KS; Chen, KL; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Sep-1997Design of a rule-based continuous process controller using modified IDEF0 methodologyChen, SG; Wu, MZ; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Sep-1997Design of a rule-based continuous process controller using modified IDEF0 methodologyChen, SG; Wu, MZ; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Oct-1997Design of a rule-based flexible manufacturing system controller using modified IDEF0 methodologyChen, SG; Wu, MZ; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Feb-2006Development of an artificial neural network to predict lead frame dimensions in an etching processLiu, TC; Li, RK; Chen, MC; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Mar-2000A due-date oriented scheduling heuristic for job shop cellular manufacturing systemTsai, CH; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
2003Enhancement of Theory of Constraints replenishment using a novel generic buffer management procedureYuan, KJ; Chang, SH; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
21-Mar-2002Exact solution of inventory replenishment policy for a linear trend in demand - two-equation modelLo, WY; Tsai, CH; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Oct-2005Graphical analysis of capability of a process producing a product familyHuang, ML; Chen, KS; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
15-Dec-2004Heuristic dispatching rule to maximize TDD and IDD performanceHo, TF; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
11-Sep-2003Heuristic PAC model for hybrid MTO and MTS production environmentChang, SH; Pai, PF; Yuan, KJ; Wang, BC; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Dec-1997Integrating order release control with due-date assignment rulesTsai, CH; Chang, GT; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Dec-1997Integrating order release control with due-date assignment rulesTsai, CH; Chang, GT; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jul-1996A methodology for schedule compressionWu, HH; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jul-1996A methodology for schedule compressionWu, HH; Li, RK; 交大名義發表; 工業工程與管理學系; National Chiao Tung University; Department of Industrial Engineering and Management
20-Jul-1999Mixing macro and micro flowtime estimation model: wafer fab exampleTseng, TY; Ho, TF; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jan-2005A new ART-counterpropagation neural network for solving a forecasting problemLiu, TC; Li, RK; 工業工程與管理學系; Department of Industrial Engineering and Management