標題: The Design of Outsourcing Planning for Semiconductor Backend Turnkey Service
作者: Chung, S. H.
Chung, I. P.
Tai, Y. T.
Chu, Y. M.
工業工程與管理學系
Department of Industrial Engineering and Management
關鍵字: Semiconductor backend turnkey service (SBTS);outsourcing;wafer fabrication
公開日期: 2008
摘要: Wafer fabrications provide the semiconductor backend turnkey service (SBTS) that help their customers to handle the outsourcing business of the three backend processing stages including circuit probing testing, integrated circuit assembly, and final testing. When the process of wafer fabrication is completed, the SBTS provider needs to select appropriate outsourcing firms and to allocate the semi-finished orders to them. In the process of selecting suitable outsourcing firms, the SBTS providers consider the constraints of limited capacity, production cost, due dates, and the processing capabilities of each outsourcing firm. The planning problem for SBTS is very complicated because of requirement variations of orders and capability variations of outsourcing firms. In this paper, a mixed integer programming model for SBTS with the total cost minimization criterion is presented. A case is also provided to demonstrate its applicability of the IP model in real practice.
URI: http://hdl.handle.net/11536/1007
http://dx.doi.org/10.1109/NCM.2008.123
ISBN: 978-0-7695-3322-3
DOI: 10.1109/NCM.2008.123
期刊: NCM 2008: 4TH INTERNATIONAL CONFERENCE ON NETWORKED COMPUTING AND ADVANCED INFORMATION MANAGEMENT, VOL 2, PROCEEDINGS
起始頁: 701
結束頁: 706
Appears in Collections:Conferences Paper


Files in This Item:

  1. 000260994400124.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.