Full metadata record
DC FieldValueLanguage
dc.contributor.authorChang, Yin-Lungen_US
dc.contributor.authorTsai, Tung-Linen_US
dc.contributor.authorYang, Jinn-Chuangen_US
dc.contributor.authorTung, Yeou-Koungen_US
dc.date.accessioned2014-12-08T15:13:12Z-
dc.date.available2014-12-08T15:13:12Z-
dc.date.issued2007-11-01en_US
dc.identifier.issn0733-9496en_US
dc.identifier.urihttp://dx.doi.org/10.1061/(ASCE)0733-9496(2007)133:6(486)en_US
dc.identifier.urihttp://hdl.handle.net/11536/10194-
dc.description.abstractThis paper presents a stochastic groundwater management model explicitly considering land subsidence. Through the use of response matrix technique and one-dimensional consolidation equation, a deterministic management model is first developed. By Latin hypercube sampling technique, along with numerical subsurface flow simulation, statistical features of unit response coefficients due to random hydrogeologic parameters, including hydraulic conductivity (K) and Lame constants (mu and lambda), are quantified. The first-ordervariance-estimation method is adopted to analyze the uncertainties of drawdown and land subsidence based on which the concept of chance-con strained programming is applied to transfer the original deterministic management model into its stochastic form. The stochastic management model enables the determination of optimal total pumpage subject to the constraints that drawdown and land subsidence do not exceed the allowable values with a specified reliability. A hypothetical example is utilized to demonstrate the applicability of the stochastic model to five cases in which various levels of parameter uncertainty are considered. The results indicate that joint consideration of drawdown and land subsidence is essential, and the proposed stochastic management model can be generally applied for regional groundwater resources management in conjunction with controlling land subsidence.en_US
dc.language.isoen_USen_US
dc.titleStochastically optimal considering groundwater management land subsidenceen_US
dc.typeArticleen_US
dc.identifier.doi10.1061/(ASCE)0733-9496(2007)133:6(486)en_US
dc.identifier.journalJOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCEen_US
dc.citation.volume133en_US
dc.citation.issue6en_US
dc.citation.spage486en_US
dc.citation.epage498en_US
dc.contributor.department土木工程學系zh_TW
dc.contributor.departmentDepartment of Civil Engineeringen_US
dc.identifier.wosnumberWOS:000250317800003-
dc.citation.woscount3-
Appears in Collections:Articles


Files in This Item:

  1. 000250317800003.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.