標題: Synchronization-based model for improving on-site data collection performance
作者: Tsai, Ming-Kuan
Yang, Jyh-Bin
Lin, Chang-Yu
土木工程學系
Department of Civil Engineering
關鍵字: theory of constraints;lean production;lean construction;information management;on-site data collection;synchronization
公開日期: 1-五月-2007
摘要: Comprehending activity status is essential to successful project management. When construction workers report activity information, project managers understand activity progresses. This procedure forms information exchange and flow. However, the lack of up-to-date information still causes project problems (such as increasing unnecessary costs, making erroneous decisions and improper activity scheduling), and highlights the importance of on-site data collection. For improving this condition, this study integrates two managerial philosophies ("theory of constraints (TOC)" and lean construction) to propose a synchronization-based model. When this model was applied for a material management case study, asynchronous operations accompanied with unnecessary subprocesses were recognized as an influence on on-site information production and transmission. This study then applied synchronous operations based on worker cooperation to resolve these problems, and evaluated the efficiency obtained by the identified measurements. The proposed model offers not only a prototype of synchronous on-site data collection, but also a mechanism for activity performance improvement. (C) 2006 Elsevier B.V. All rights reserved.
URI: http://dx.doi.org/10.1016/j.autcon.2006.07.001
http://hdl.handle.net/11536/10856
ISSN: 0926-5805
DOI: 10.1016/j.autcon.2006.07.001
期刊: AUTOMATION IN CONSTRUCTION
Volume: 16
Issue: 3
起始頁: 323
結束頁: 335
顯示於類別:期刊論文


文件中的檔案:

  1. 000244917600007.pdf

若為 zip 檔案,請下載檔案解壓縮後,用瀏覽器開啟資料夾中的 index.html 瀏覽全文。