完整後設資料紀錄
DC 欄位語言
dc.contributor.authorSha, D. Y.en_US
dc.contributor.authorHsu, S. Y.en_US
dc.contributor.authorChe, Z. H.en_US
dc.contributor.authorChen, C. H.en_US
dc.date.accessioned2014-12-08T15:16:13Z-
dc.date.available2014-12-08T15:16:13Z-
dc.date.issued2006-07-01en_US
dc.identifier.issn0360-8352en_US
dc.identifier.urihttp://dx.doi.org/10.1016/j.cie.2006.04.002en_US
dc.identifier.urihttp://hdl.handle.net/11536/12051-
dc.description.abstractGenerally speaking, wafer fabrication factories define the photolithography area as the dispatching center of the entire factory. To establish a set of operative dispatching rules in the photolithography area while taking into consideration the rework of defective products would assist in coordinating and balancing the workload of the entire production line. Furthermore, it would help to enhance both the productivity and efficiency of the wafer fabrication, reduce the on-line WIP stock, shorten the production cycle time, and satisfy the requirements of customers regarding production due time and product quality. This research uses on-line rework as the basis for bringing the factor of reworking of a batch process into the dispatching rule for measurement. It then develops the dispatching rule (Rw-DR) which includes the rework strategy. In addition, this research focuses on the batch with high finished proportion in the photolithography area for finding a way to complete the manufacturing procedure faster, lighten the machine workload of the waiting line, and at the same time increase the output quantity. (c) 2006 Elsevier Ltd. All rights reserved.en_US
dc.language.isoen_USen_US
dc.subjectphotolithography areaen_US
dc.subjectdispatching ruleen_US
dc.subjecton-line reworken_US
dc.subjectfinished proportionen_US
dc.titleA dispatching rule for photolithography scheduling with an on-line rework strategyen_US
dc.typeArticleen_US
dc.identifier.doi10.1016/j.cie.2006.04.002en_US
dc.identifier.journalCOMPUTERS & INDUSTRIAL ENGINEERINGen_US
dc.citation.volume50en_US
dc.citation.issue3en_US
dc.citation.spage233en_US
dc.citation.epage247en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:000241153400004-
dc.citation.woscount15-
顯示於類別:期刊論文


文件中的檔案:

  1. 000241153400004.pdf

若為 zip 檔案,請下載檔案解壓縮後,用瀏覽器開啟資料夾中的 index.html 瀏覽全文。