Full metadata record
DC FieldValueLanguage
dc.contributor.authorPearn, WLen_US
dc.contributor.authorChung, SHen_US
dc.contributor.authorYang, MHen_US
dc.contributor.authorChen, CYen_US
dc.date.accessioned2014-12-08T15:18:33Z-
dc.date.available2014-12-08T15:18:33Z-
dc.date.issued2005-09-01en_US
dc.identifier.issn1072-4761en_US
dc.identifier.urihttp://hdl.handle.net/11536/13355-
dc.description.abstractThe integrated-circuit-packaging scheduling problem (ICPSP) is a variation of the flexible flow-shop scheduling problem, which is also a generalization of the classical flow-shop and the identical parallel-machine problems. In this paper, we present a case study on the ICPSP. For the ICPSP we investigate, the jobs are clustered by their product types, which must be processed on groups of machines at various process stages following the manufacturing sequence, and be completed before the due dates. The job processing time depends on the product type, and the machine setup time is sequentially dependent on the orders of jobs processed. We present two efficient solution procedures to solve the ICPSP case. We generate a set of 11 ICPSP problems, which involve various setup time, processing time, and due date factors. The proposed savings approaches are shown to perform efficiently in solving the ICPSP. Significance: The integrated-circuit-packaging scheduling problem (ICPSP) is a practical but complex scheduling problem, which has many real world applications. The proposed approaches show the superiority to the traditional dispatch rules and solve the ICPSP efficiently.en_US
dc.language.isoen_USen_US
dc.subjectIC packagingen_US
dc.subjectparallel-machine schedulingen_US
dc.subjectsequence-dependent setup timeen_US
dc.subjectflexible flow shop schedulingen_US
dc.titleThe integrated circuit packaging scheduling problem (ICPSP): A case studyen_US
dc.typeArticleen_US
dc.identifier.journalINTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICEen_US
dc.citation.volume12en_US
dc.citation.issue3en_US
dc.citation.spage296en_US
dc.citation.epage307en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:000231695200010-
dc.citation.woscount3-
Appears in Collections:Articles