Title: Royalty Analysis for BOT Projects Based on The Negotiation Viewpoint
Authors: Kang, Chao-Chung
Feng, Cheng-Min
Kuo, Chiu-Yen
運輸與物流管理系 註:原交通所+運管所
Department of Transportation and Logistics Management
Keywords: BOT;royalty;negotiation;bi-level programming
Issue Date: 2009
Abstract: This study constructs three royalty negotiation models, including the lump-sum royalty, operational revenue-based royalty, and operational output-based royalty, using the bi-level programming approach. In addition, this paper also develops the iterative algorithm for bi-level programming problem for the government and the private sector. A number of factors were incorporated into this algorithm including concession rate, time value discount rate, learning rate and number of negotiations.
URI: http://dx.doi.org/10.1109/IEEM.2009.5373178
http://hdl.handle.net/11536/134932
ISBN: 978-1-4244-4869-2
ISSN: 2157-3611
DOI: 10.1109/IEEM.2009.5373178
Journal: 2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4
Begin Page: 1820
End Page: +
Appears in Collections:Conferences Paper