標題: 經濟批量排程之研究
A Study on Economic Lot Scheduling Problem
作者: 陳文哲
楊銘賢
W.C.Chen
M.H.Yang
公開日期: Apr-1980
出版社: 交大學刊編輯委員會
摘要: 單一機器設備生產多種產品時的生產決策,包括生產時點、生產批量、生產順序等之決定,此即ELSP。ELSP的決策直接關係到產品成本之高低,因此,決策方法必須適當選取。本文找出一些影響ELSP決策的主要因素,並針對肯定不變需求及隨機需求等兩種情形,在「使總變動成本為最小」的評估準則下,分別提出一些決策方法,作為實際問題的解決工具,同時也將這些方法實際應用到彩藝工廠中,比較其優劣,作為決策者之參考。
The production decision of a single-machine, multi-product system is a problem of deciding the time, the quality and the sequence to produce.It is called Economic Lot Size Problem(ELSP).The decision of ELSP is directly concerned with the product cost.A method must be therefore properly selected. This paper finds out several major factors which affect the decision of ELSP.It also proposes some decision methods as tools in practice.These methods will be developed under the common evaluating criterion of minimizing the total variable product cost and be discussed both in determinstic, constant demand and stochastic demand case.Finally, these methods will be practically applied in a plant to explain their decision procedure and to compare their effectiveness for the reference of decision-maker.
URI: http://hdl.handle.net/11536/137524
期刊: 交通大學學報
The Journal of National Chiao Tung University
Volume: 7
Issue: Supplement
起始頁: 1
結束頁: =O110-1
Appears in Collections:The Journal of National Chiao Tung University


Files in This Item:

  1. HT001314-01.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.