完整後設資料紀錄
DC 欄位語言
dc.contributor.author陳文哲zh_TW
dc.contributor.author楊銘賢zh_TW
dc.contributor.authorW.C.Chenen_US
dc.contributor.authorM.H.Yangen_US
dc.date.accessioned2017-10-06T06:22:24Z-
dc.date.available2017-10-06T06:22:24Z-
dc.date.issued1980-04en_US
dc.identifier.urihttp://hdl.handle.net/11536/137524-
dc.description.abstract單一機器設備生產多種產品時的生產決策,包括生產時點、生產批量、生產順序等之決定,此即ELSP。ELSP的決策直接關係到產品成本之高低,因此,決策方法必須適當選取。本文找出一些影響ELSP決策的主要因素,並針對肯定不變需求及隨機需求等兩種情形,在「使總變動成本為最小」的評估準則下,分別提出一些決策方法,作為實際問題的解決工具,同時也將這些方法實際應用到彩藝工廠中,比較其優劣,作為決策者之參考。zh_TW
dc.description.abstractThe production decision of a single-machine, multi-product system is a problem of deciding the time, the quality and the sequence to produce.It is called Economic Lot Size Problem(ELSP).The decision of ELSP is directly concerned with the product cost.A method must be therefore properly selected. This paper finds out several major factors which affect the decision of ELSP.It also proposes some decision methods as tools in practice.These methods will be developed under the common evaluating criterion of minimizing the total variable product cost and be discussed both in determinstic, constant demand and stochastic demand case.Finally, these methods will be practically applied in a plant to explain their decision procedure and to compare their effectiveness for the reference of decision-maker.en_US
dc.language.isozh_TWen_US
dc.publisher交大學刊編輯委員會zh_TW
dc.title經濟批量排程之研究zh_TW
dc.titleA Study on Economic Lot Scheduling Problemen_US
dc.typeCampus Publicationsen_US
dc.identifier.journal交通大學學報zh_TW
dc.identifier.journalThe Journal of National Chiao Tung Universityen_US
dc.citation.volume7en_US
dc.citation.issueSupplementen_US
dc.citation.spage1en_US
dc.citation.epage=O110-1en_US
顯示於類別:交通大學學報


文件中的檔案:

  1. HT001314-01.pdf

若為 zip 檔案,請下載檔案解壓縮後,用瀏覽器開啟資料夾中的 index.html 瀏覽全文。