完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.author | 黃俊雄 | zh_TW |
dc.contributor.author | 楊照崑 | zh_TW |
dc.contributor.author | J.S.Huang | en_US |
dc.contributor.author | M.C.K.Yang | en_US |
dc.date.accessioned | 2017-10-06T06:22:53Z | - |
dc.date.available | 2017-10-06T06:22:53Z | - |
dc.date.issued | 1978-07 | en_US |
dc.identifier.uri | http://hdl.handle.net/11536/137616 | - |
dc.description.abstract | A production process with two quality levels and four states is presented.A sequence (k) sampling plan in which samples of k(k>0) consecutively produced items are taken periodically,and a simple decision rule based on the result of inspecting each sample are applied to control the process. It is assumed that each item has two correlated attributes X and Y. In practice, the cost of inspection of X is higher than the cost of inspection of Y and the result of inspectig X determines the item is good (acceptable) or bad (unacceptable).The problem of whether to use the inspection of X or Y is studied and some approximation results are obtained to compare the two inspection costs corresponding to X and Y. | en_US |
dc.language.iso | en_US | en_US |
dc.publisher | 交大學刊編輯委員會 | zh_TW |
dc.title | 相關不良品檢驗對生產管制影響的推廣 | zh_TW |
dc.title | The Generalization of The Effect of Correlated Defective Inspection Scheme for Process Control | en_US |
dc.type | Campus Publications | en_US |
dc.identifier.journal | 交通大學學報 | zh_TW |
dc.identifier.journal | The Journal of National Chiao Tung University | en_US |
dc.citation.volume | 5 | en_US |
dc.citation.spage | 69 | en_US |
dc.citation.epage | 72 | en_US |
顯示於類別: | 交通大學學報 |