Title: | Optimal production run time for two-stage production system with imperfect processes and allowable shortages |
Authors: | Pearn, W. L. Su, R. H. Weng, M. W. Hsu, C. H. 工業工程與管理學系 Department of Industrial Engineering and Management |
Keywords: | Inventory;Imperfect production process;Quality improvement;Shortages;Two-stage system |
Issue Date: | 1-Dec-2011 |
Abstract: | This paper considers a two-stage production system with imperfect processes. Shortages are allowed, and the unsatisfied demand is completely backlogged. In addition, the capital investment in process quality improvement is adopted. Under these assumptions, we first formulate the proposed problem as a cost minimization model where the production run time and process quality are decision variables. Then we develop the criterion for judging whether the optimal solution not only exists but also is unique. If the criterion is not satisfied, the production system should not be opened. An algorithm for the computations of the optimal solutions is also provided. Finally, a numerical example and sensitivity analysis are carried out to illustrate the model. |
URI: | http://dx.doi.org/10.1007/s10100-010-0143-x http://hdl.handle.net/11536/14631 |
ISSN: | 1435-246X |
DOI: | 10.1007/s10100-010-0143-x |
Journal: | CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH |
Volume: | 19 |
Issue: | 4 |
Begin Page: | 533 |
End Page: | 545 |
Appears in Collections: | Articles |
Files in This Item:
If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.