完整後設資料紀錄
DC 欄位語言
dc.contributor.authorHwang, F. J.en_US
dc.contributor.authorLin, B. M. T.en_US
dc.date.accessioned2019-04-02T05:59:33Z-
dc.date.available2019-04-02T05:59:33Z-
dc.date.issued2018-10-01en_US
dc.identifier.issn0305-0548en_US
dc.identifier.urihttp://dx.doi.org/10.1016/j.cor.2018.05.016en_US
dc.identifier.urihttp://hdl.handle.net/11536/147942-
dc.description.abstractThis study considers the manufacturing environments in which m + 1 machines are configured as two stage flexible flow shops with dedicated machines (F2DM). The F2DM scheduling problems arise naturally from practical production and fabrication systems, and they are classified into two categories, whose machine settings are antithetical to each other. In model 1, a single common bottleneck machine is installed at stage 1 and m parallel dedicated machines comprise stage 2. The second model has the m dedicated machines at stage 1 and the bottleneck machine at stage 2. Categorizing the literature according to the performance metrics, we survey the existing research results of the two models and propose several new solution procedures with improved computational complexity. The complexity results are summarized, and suggestions are made for future research. (C) 2018 Elsevier Ltd. All rights reserved.en_US
dc.language.isoen_USen_US
dc.subjectFlexible flow shopen_US
dc.subjectDedicated machinesen_US
dc.subjectComputational complexityen_US
dc.subjectReviewen_US
dc.titleSurvey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machinesen_US
dc.typeArticleen_US
dc.identifier.doi10.1016/j.cor.2018.05.016en_US
dc.identifier.journalCOMPUTERS & OPERATIONS RESEARCHen_US
dc.citation.volume98en_US
dc.citation.spage103en_US
dc.citation.epage112en_US
dc.contributor.department資訊管理與財務金融系 註:原資管所+財金所zh_TW
dc.contributor.departmentDepartment of Information Management and Financeen_US
dc.identifier.wosnumberWOS:000440526800008en_US
dc.citation.woscount0en_US
顯示於類別:期刊論文