Full metadata record
DC FieldValueLanguage
dc.contributor.authorTsai, CHen_US
dc.contributor.authorChang, GTen_US
dc.contributor.authorLi, RKen_US
dc.date.accessioned2019-04-02T05:58:45Z-
dc.date.available2019-04-02T05:58:45Z-
dc.date.issued1997-12-01en_US
dc.identifier.issn0020-7543en_US
dc.identifier.urihttp://dx.doi.org/10.1080/002075497194138en_US
dc.identifier.urihttp://hdl.handle.net/11536/149696-
dc.description.abstractThis study integrates order release control methods with due-date assignment rules and assesses its impact on the accuracy of inter-operation time estimation and performance of due-date assignment. The assessment is made by using an experimental design with three due-date assignment rules, three scheduling rules and three order release models. The three order release models are: (1) Basic model, in which three due-date assignment rules consider the order arrival time as the order release time; (2) Control model, in which three due-date assignment rules integrate with the order release control method developed here; and (3) Adjustment model, in which the control model integrates with the order release control adjustment developed here. Simulation results in this study indicate that integrating the order release control method with due-date assignment rules will significantly enhance not only the accuracy of interoperation time estimation, but also the performance of due-date assignment rules.en_US
dc.language.isoen_USen_US
dc.titleIntegrating order release control with due-date assignment rulesen_US
dc.typeArticleen_US
dc.identifier.doi10.1080/002075497194138en_US
dc.identifier.journalINTERNATIONAL JOURNAL OF PRODUCTION RESEARCHen_US
dc.citation.volume35en_US
dc.citation.spage3379en_US
dc.citation.epage3392en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:A1997YJ21900009en_US
dc.citation.woscount24en_US
Appears in Collections:Articles