完整後設資料紀錄
DC 欄位語言
dc.contributor.authorWu, Chia-Huangen_US
dc.contributor.authorYang, Dong-Yuhen_US
dc.date.accessioned2019-12-13T01:12:19Z-
dc.date.available2019-12-13T01:12:19Z-
dc.date.issued1970-01-01en_US
dc.identifier.issn2193-567Xen_US
dc.identifier.urihttp://dx.doi.org/10.1007/s13369-019-04196-9en_US
dc.identifier.urihttp://hdl.handle.net/11536/153183-
dc.description.abstractThis study examines the dynamic control of an M/M/2 machine repair system with R operating machines, S standbys, and two unreliable repairmen, wherein standbys are subject to switching failures. We apply the matrix analytic method to derive explicit expressions of the stationary probability distributions as well as matrix expressions of the system performance measures. We construct a cost model and determine the optimal dynamic operating policy to minimize the expected cost function per unit time. Sensitivity analysis is conducted using numerical examples. The results of sensitivity analysis indicate that the optimal thresholds and corresponding minimum expected cost increase as the number of operating machines or standbys increases. Moreover, the minimum expected cost is sensitive to the mean arrival and repair rates. The results provide managers with decision reference for productivity improvement and cost reduction.en_US
dc.language.isoen_USen_US
dc.subjectDynamic controlen_US
dc.subjectMachine repair problemen_US
dc.subjectSensitivity analysisen_US
dc.subjectSwitching failureen_US
dc.subjectVacationen_US
dc.titleDynamic Control of a Machine Repair Problem with Switching Failure and Unreliable Repairmenen_US
dc.typeArticleen_US
dc.identifier.doi10.1007/s13369-019-04196-9en_US
dc.identifier.journalARABIAN JOURNAL FOR SCIENCE AND ENGINEERINGen_US
dc.citation.spage0en_US
dc.citation.epage0en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:000492566500001en_US
dc.citation.woscount0en_US
顯示於類別:期刊論文