完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.author | Tsai, CH | en_US |
dc.contributor.author | Chang, GT | en_US |
dc.contributor.author | Li, RK | en_US |
dc.date.accessioned | 2014-12-08T15:01:17Z | - |
dc.date.available | 2014-12-08T15:01:17Z | - |
dc.date.issued | 1997-12-01 | en_US |
dc.identifier.issn | 0020-7543 | en_US |
dc.identifier.uri | http://hdl.handle.net/11536/166 | - |
dc.description.abstract | This study integrates order release control methods with due-date assignment rules and assesses its impact on the accuracy of inter-operation time estimation and performance of due-date assignment. The assessment is made by using an experimental design with three due-date assignment rules, three scheduling rules and three order release models. The three order release models are: (1) Basic model, in which three due-date assignment rules consider the order arrival time as the order release time; (2) Control model, in which three due-date assignment rules integrate with the order release control method developed here; and (3) Adjustment model, in which the control model integrates with the order release control adjustment developed here. Simulation results in this study indicate that integrating the order release control method with due-date assignment rules will significantly enhance not only the accuracy of interoperation time estimation, but also the performance of due-date assignment rules. | en_US |
dc.language.iso | en_US | en_US |
dc.title | Integrating order release control with due-date assignment rules | en_US |
dc.type | Article | en_US |
dc.identifier.journal | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH | en_US |
dc.citation.volume | 35 | en_US |
dc.citation.issue | 12 | en_US |
dc.citation.spage | 3379 | en_US |
dc.citation.epage | 3392 | en_US |
dc.contributor.department | 工業工程與管理學系 | zh_TW |
dc.contributor.department | Department of Industrial Engineering and Management | en_US |
顯示於類別: | 期刊論文 |