標題: | A scheduling model for the refurbishing process in recycling management |
作者: | Cheng, T. C. E. Lin, B. M. T. Tian, Y. 資訊管理與財務金融系 註:原資管所+財金所 Department of Information Management and Finance |
關鍵字: | refurbishing flowshop;operation-based performance measure;weighted total completion time;approximation algorithm |
公開日期: | 1-十一月-2013 |
摘要: | We propose from the perspective of operations scheduling a novel model of the refurbishing process in recycling management. We model the refurbishing process as a two-stage flowshop that dismantles products into parts in stage one and refurbishes the parts on dedicated machines in stage two. The model also features that the performance measure of a schedule is defined by operation-based completion times, which is different from the job-based performance measures traditionally adopted in the scheduling literature. We analyse the optimality properties and computational complexity of some special cases of the problem. We derive lower bounds on the optimal solution based on a disaggregation technique and the assignment problem, and develop dominance rules incorporating estimates of the effects of partial schedules on unscheduled jobs. We present a heuristic approach, based on LP relaxation, and analyse its performance ratio. We also develop two metaheuristic algorithms, based on iterated local search and ant colony optimisation, to produce approximate solutions. The results of computational experiments show that the metaheuristics generate better solutions than the simple weighted shortest processing time dispatching rule, and the NEH-based and CDS-based algorithms, which are commonly deployed to treat the classical two-machine flowshop scheduling problem. |
URI: | http://dx.doi.org/10.1080/00207543.2013.842024 http://hdl.handle.net/11536/23466 |
ISSN: | 0020-7543 |
DOI: | 10.1080/00207543.2013.842024 |
期刊: | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH |
Volume: | 51 |
Issue: | 23-24 |
起始頁: | 7120 |
結束頁: | 7139 |
顯示於類別: | 期刊論文 |