標題: A scheduling model for the refurbishing process in recycling management
作者: Cheng, T. C. E.
Lin, B. M. T.
Tian, Y.
資訊管理與財務金融系 註:原資管所+財金所
Department of Information Management and Finance
關鍵字: refurbishing flowshop;operation-based performance measure;weighted total completion time;approximation algorithm
公開日期: 1-十一月-2013
摘要: We propose from the perspective of operations scheduling a novel model of the refurbishing process in recycling management. We model the refurbishing process as a two-stage flowshop that dismantles products into parts in stage one and refurbishes the parts on dedicated machines in stage two. The model also features that the performance measure of a schedule is defined by operation-based completion times, which is different from the job-based performance measures traditionally adopted in the scheduling literature. We analyse the optimality properties and computational complexity of some special cases of the problem. We derive lower bounds on the optimal solution based on a disaggregation technique and the assignment problem, and develop dominance rules incorporating estimates of the effects of partial schedules on unscheduled jobs. We present a heuristic approach, based on LP relaxation, and analyse its performance ratio. We also develop two metaheuristic algorithms, based on iterated local search and ant colony optimisation, to produce approximate solutions. The results of computational experiments show that the metaheuristics generate better solutions than the simple weighted shortest processing time dispatching rule, and the NEH-based and CDS-based algorithms, which are commonly deployed to treat the classical two-machine flowshop scheduling problem.
URI: http://dx.doi.org/10.1080/00207543.2013.842024
http://hdl.handle.net/11536/23466
ISSN: 0020-7543
DOI: 10.1080/00207543.2013.842024
期刊: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume: 51
Issue: 23-24
起始頁: 7120
結束頁: 7139
顯示於類別:期刊論文


文件中的檔案:

  1. 000328246000027.pdf

若為 zip 檔案,請下載檔案解壓縮後,用瀏覽器開啟資料夾中的 index.html 瀏覽全文。