標題: | Optimizing assembly planning through a three-stage integrated approach |
作者: | Chen, RS Lu, KY Tai, PH 資訊管理與財務金融系 註:原資管所+財金所 Department of Information Management and Finance |
關鍵字: | assembly planning;design for assembly;minimum spanning tree;assembly precedent diagram |
公開日期: | 18-Apr-2004 |
摘要: | This study proposes a three-stage integrated approach with heuristic working rules to assist the planner to develop a better assembly plan. In the first stage, Above Graph and transforming rules were used to create a correct Explosion Graph of the assembly models. In the second stage, a three-level relational model was developed to create a complete relational model graph and an incidence matrix. In the third stage, a mathematical model, based on a penalty index was formulated, and a revised minimum spanning table method was used to generate and evaluate a feasible assembly sequence. The example of a military system is presented to demonstrate the feasibility of the proposed method. The contribution of this study is based oil a design for assembly potential applications of three-dimensional (313) component models to assist manual or automatic assembly in a virtual environment, and allows the designer to recognize the relative position, constraints and relationships of 3D components using graph-oriented methods: Above Graph, assembly precedent diagram, and relational model graph. (C) 2003 Elsevier B.V. All rights reserved. |
URI: | http://dx.doi.org/10.1016/S0925-5273(03)00187-7 http://hdl.handle.net/11536/26864 |
ISSN: | 0925-5273 |
DOI: | 10.1016/S0925-5273(03)00187-7 |
期刊: | INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS |
Volume: | 88 |
Issue: | 3 |
起始頁: | 243 |
結束頁: | 256 |
Appears in Collections: | Articles |
Files in This Item:
If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.