Full metadata record
DC FieldValueLanguage
dc.contributor.authorCHENG, TCEen_US
dc.contributor.authorDIAMOND, JEen_US
dc.contributor.authorLIN, BMTen_US
dc.date.accessioned2014-12-08T15:04:15Z-
dc.date.available2014-12-08T15:04:15Z-
dc.date.issued1993-12-01en_US
dc.identifier.issn0022-3239en_US
dc.identifier.urihttp://dx.doi.org/10.1007/BF00940554en_US
dc.identifier.urihttp://hdl.handle.net/11536/2746-
dc.description.abstractThe problem of minimizing the cost due to talent hold days in the production of a feature film is considered. A combinatorial model is developed for the sequencing of shooting days in a film shoot. The problem is shown to be strongly NP-hard. A branch-and-bound solution algorithm and a heuristic solution method for large instances of the problem (15 shooting days or more) are developed and implemented on a computer. A number of randomly generated problem instances are solved to study the power and speed of the algorithms. The computational results reveal that the heuristic solution method is effective and efficient in obtaining near-optimal solutions.en_US
dc.language.isoen_USen_US
dc.subjectSCHEDULINGen_US
dc.subjectBRANCH-AND-BOUND ALGORITHMSen_US
dc.subjectNP-HARDNESSen_US
dc.titleOPTIMAL SCHEDULING IN FILM PRODUCTION TO MINIMIZE TALENT HOLD COSTen_US
dc.typeArticleen_US
dc.identifier.doi10.1007/BF00940554en_US
dc.identifier.journalJOURNAL OF OPTIMIZATION THEORY AND APPLICATIONSen_US
dc.citation.volume79en_US
dc.citation.issue3en_US
dc.citation.spage479en_US
dc.citation.epage492en_US
dc.contributor.department資訊工程學系zh_TW
dc.contributor.departmentDepartment of Computer Scienceen_US
dc.identifier.wosnumberWOS:A1993MR31500003-
dc.citation.woscount4-
Appears in Collections:Articles


Files in This Item:

  1. A1993MR31500003.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.