完整後設資料紀錄
DC 欄位語言
dc.contributor.authorChen, JPen_US
dc.contributor.authorTong, LIen_US
dc.date.accessioned2014-12-08T15:41:31Z-
dc.date.available2014-12-08T15:41:31Z-
dc.date.issued2003en_US
dc.identifier.issn0268-3768en_US
dc.identifier.urihttp://hdl.handle.net/11536/28234-
dc.identifier.urihttp://dx.doi.org/10.1007/s001700300029en_US
dc.description.abstractThe process capability index, C-pk, is extensively used to assess process performance in manufacturing industry. Statistical hypothesis testing or an interval estimation of a single C-pk had been derived under a normally distributed process. However, the difference between two process capabilily indices, C-pk1 - C-pk2, cannot be inferred statistically because of the complexily of the sampling probability theory. This study proposes a bootstrap resampling simulation method to construct the biased corrected percentile bootstrap (BCPB) confidence interval Of (C-pk1 - C-pk2), which can be used to select the better of two suppliers. The various simulation results indicate that the bootstrap confidence interval Of (C-pk1 - C-pk2) can be employed to evaluate effectively the difference between the performance of two suppliers.en_US
dc.language.isoen_USen_US
dc.subjectbootstrap methoden_US
dc.subjectinterval estimationen_US
dc.subjectprocess capability indexen_US
dc.subjectsensitivity analysisen_US
dc.titleBootstrap confidence interval of the difference between two process capability indicesen_US
dc.typeArticleen_US
dc.identifier.doi10.1007/s001700300029en_US
dc.identifier.journalINTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGYen_US
dc.citation.volume21en_US
dc.citation.issue4en_US
dc.citation.spage249en_US
dc.citation.epage256en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:000182426500004-
dc.citation.woscount7-
顯示於類別:期刊論文


文件中的檔案:

  1. 000182426500004.pdf

若為 zip 檔案,請下載檔案解壓縮後,用瀏覽器開啟資料夾中的 index.html 瀏覽全文。