| 標題: | Dynamic optimal ground water remediation including fixed and operation costs |
| 作者: | Chang, LC Hsiao, CT 土木工程學系 Department of Civil Engineering |
| 公開日期: | 1-九月-2002 |
| 摘要: | lit time-varying ground water remediation, the lack of an optimal control algorithm to simultaneously consider fixed costs and time-varying operating costs makes it nearly impossible to obtain an optimal solution. This study presents a novel algorithm that integrates a genetic algorithm (GA) and constrained differential dynamic programming (CDDP) to solve this time-varying ground water remediation problem. A GA can easily incorporate the fixed costs associated with the installation of wells. However, using a GA to solve for time-varying policies would dramatically increase the computational resources required. Therefore, the CDDP is used to handle the subproblems associated with time-varying operating costs. A hypothetical case study that incorporates fixed and time-varying operating costs is presented to demonstrate the effectiveness of the proposed algorithm. Simulation results indicate that the fixed costs can significantly influence the number and locations of wells, and a notable total cost savings can be realized by applying the novel algorithm herein. |
| URI: | http://hdl.handle.net/11536/28537 |
| ISSN: | 0017-467X |
| 期刊: | GROUND WATER |
| Volume: | 40 |
| Issue: | 5 |
| 起始頁: | 481 |
| 結束頁: | 490 |
| 顯示於類別: | 期刊論文 |

