完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.author | Tsai, CH | en_US |
dc.contributor.author | Li, RK | en_US |
dc.date.accessioned | 2014-12-08T15:45:34Z | - |
dc.date.available | 2014-12-08T15:45:34Z | - |
dc.date.issued | 2000-03-01 | en_US |
dc.identifier.issn | 1072-4761 | en_US |
dc.identifier.uri | http://hdl.handle.net/11536/30660 | - |
dc.description.abstract | Although having gained further insight into scheduling problems involving cellular manufacturing systems, previous research has neglected two characteristics that are essential for effective group scheduling: first, due-date performance focus; second, setup time savings by emphasizing constrained and non-constrained machines. To overcome these two characteristics, we present a due-date oriented scheduling heuristic algorithm for jab shop cellular manufacturing system based on Capacity Constraint Resource (CCR). The proposed algorithm consists of four stages: (1) schedule development for CCR (DRUM), (2) CCR setup time savings to decrease mean tardiness, (3) CCR setup time savings to maximize CCR throughput, and (4) development of a hybrid scheduling method to minimize total flowtime and the work-in-process (WIP) inventory. Also, an illustrative example demonstrates the feasibility of the proposed method. Significance: This study has developed a due-date oriented scheduling heuristic algorithm for job shop cellular manufacturing environments. The proposed algorithm's strong performance indicates that our four-stage group scheduling heuristic, with its more sensitive switching procedures, can not only overcome some of the weaknesses shown by exhaustive and non-exhaustive scheduling heuristics, but can also glean setup time savings without sacrificing due-date performance. | en_US |
dc.language.iso | en_US | en_US |
dc.subject | flowtime | en_US |
dc.subject | TOC | en_US |
dc.subject | DBR | en_US |
dc.subject | Capacity Constraint Resource (CCR) | en_US |
dc.subject | hybrid scheduling | en_US |
dc.title | A due-date oriented scheduling heuristic for job shop cellular manufacturing system | en_US |
dc.type | Article | en_US |
dc.identifier.journal | INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE | en_US |
dc.citation.volume | 7 | en_US |
dc.citation.issue | 1 | en_US |
dc.citation.spage | 76 | en_US |
dc.citation.epage | 88 | en_US |
dc.contributor.department | 工業工程與管理學系 | zh_TW |
dc.contributor.department | Department of Industrial Engineering and Management | en_US |
dc.identifier.wosnumber | WOS:000086359500009 | - |
dc.citation.woscount | 4 | - |
顯示於類別: | 期刊論文 |