Title: Interim equipment shutdown planning for a wafer fab during economic downturns
Authors: Chung, Shu-Hsing
Hsieh, Ming-Hsiu
工業工程與管理學系
Department of Industrial Engineering and Management
Keywords: Tool portfolio;Cost reduction;Capacity planning;Semiconductor
Issue Date: 1-Nov-2010
Abstract: Because of the low equipment utilization during periods of economic recession, managers of wafer labs are forced to plan equipment shutdowns in order to reduce variable cost and reallocate resources. Unfortunately, few studies have proposed effective solutions for equipment shutdown planning in response to economic downturns. Taking into consideration the product mix, corresponding output target, excessive capacity, production performance impact and the variable cost savings, this paper presents a new mechanism for equipment shutdown planning using a developed integer programming model. The proposed mechanism effectively provides valuable recommendations for the managements of wafer fabs regarding the type and quantity of equipment to shut down. Crown Copyright (C) 2010 Published by Elsevier Ltd. All rights reserved.
URI: http://dx.doi.org/10.1016/j.cie.2010.08.009
http://hdl.handle.net/11536/31988
ISSN: 0360-8352
DOI: 10.1016/j.cie.2010.08.009
Journal: COMPUTERS & INDUSTRIAL ENGINEERING
Volume: 59
Issue: 4
Begin Page: 819
End Page: 829
Appears in Collections:Articles


Files in This Item:

  1. 000284747000039.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.