dc.description.abstractIn today's competitive environment, reducing Work in Process (WIP) to improve cycle time, delivery and product quality has become the key to maintaining profitability. However, due to conservative attitudes and conceptual mistakes, WIP has spread along the entire production pipe line. Although intended to maximize the utilization of resources, WIP can be caused to become over-sized. This maximum utilization of resources syndrome has been proved incorrect by the Theory of Constraint and WIP should be queued only in front of constraint machine, thereby ensuring the constraint machine not starvation. Although this concept has been proved correct and despite many reported examples of successful implementation in many companies, in practice, the WIP level is still determined by the trial and error approach. Therefore, a WIP computation model is deemed necessary. In this paper, a constraint time buffer determination model is proposed. The model first proposes a machine-view's bill of routing representing a structure that serves as a fundamental structure for formulating and computing the maximum time buffer. The machine-view's bill of routing is a tree structure, the constraint machine is the root node and its feeder machines are entry nodes (or subtrees) of the root node. With this tree structure, the behaviour (or stability) of the constraint machine and its feeder machines can then be studied and formulated. By incorporating the MTTR of each feeder machine, a mathematical relationship can then be formulated and the time buffer computed. Furthermore, to validate the proposed constraint time buffer determination model, an example is illustrated and a simulation model is also developed.en_US
dc.language.isoen_USen_US
dc.titleConstraint time buffer determination modelen_US
dc.typeArticleen_US
dc.identifier.journalINTERNATIONAL JOURNAL OF PRODUCTION RESEARCHen_US
dc.citation.volume36en_US
dc.citation.issue4en_US
dc.citation.spage1091en_US
dc.citation.epage1103en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:000073068000011-
dc.citation.woscount13-
顯示於類別:期刊論文


文件中的檔案:

  1. 000073068000011.pdf

若為 zip 檔案,請下載檔案解壓縮後,用瀏覽器開啟資料夾中的 index.html 瀏覽全文。