Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | 李洌 | en_US |
| dc.contributor.author | Li, Lie | en_US |
| dc.contributor.author | 林心宇 | en_US |
| dc.contributor.author | Lin, Xin Yu | en_US |
| dc.date.accessioned | 2014-12-12T02:14:14Z | - |
| dc.date.available | 2014-12-12T02:14:14Z | - |
| dc.date.issued | 1994 | en_US |
| dc.identifier.uri | http://140.113.39.130/cdrfb3/record/nctu/#NT832327002 | en_US |
| dc.identifier.uri | http://hdl.handle.net/11536/59719 | - |
| dc.language.iso | en_US | en_US |
| dc.title | 製造系統排程問題之研究 | zh_TW |
| dc.title | A study of scheduling of manufacturing systems | en_US |
| dc.type | Thesis | en_US |
| dc.contributor.department | 電控工程研究所 | zh_TW |
| Appears in Collections: | Thesis | |

