Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Wu, Muh-Cherng | en_US |
| dc.contributor.author | Chiou, Chie-Wun | en_US |
| dc.date.accessioned | 2014-12-08T15:08:00Z | - |
| dc.date.available | 2014-12-08T15:08:00Z | - |
| dc.date.issued | 2010 | en_US |
| dc.identifier.issn | 0020-7543 | en_US |
| dc.identifier.uri | http://hdl.handle.net/11536/6280 | - |
| dc.identifier.uri | http://dx.doi.org/10.1080/00207540802577920 | en_US |
| dc.description.abstract | This paper presents a scheduling method for an in-line stepper operating in a new process/production introduction (NPI) scenario. An in-line stepper is a bottleneck machine in a semiconductor fab. Its interior is comprised of a series of chambers, while its exterior is a dock equipped with a limited number of ports. The transportation unit for each chamber is a piece of wafer, while that for each port is a job that can contain up to 25 wafers. This transportation incompatibility may lead to an unexpected capacity loss for an in-line stepper - in particular in an NPI scenario that, by nature, includes a substantial number of small-sized jobs. Such a capacity loss can be alleviated by effective scheduling. A genetic algorithm (GA) scheduling method is proposed to enhance the productivity of in-line steppers. Four other sequencing methods are compared with the GA method. Numeric experiments indicate that the GA method outperforms the four benchmarks. The higher the percentage of small-sized jobs, the better the performance of the GA. | en_US |
| dc.language.iso | en_US | en_US |
| dc.subject | activity based costing | en_US |
| dc.subject | design of experiments | en_US |
| dc.subject | design for manufacture | en_US |
| dc.subject | availability | en_US |
| dc.subject | capability indices | en_US |
| dc.subject | computer vision | en_US |
| dc.subject | control charts | en_US |
| dc.subject | robotics | en_US |
| dc.title | Scheduling semiconductor in-line steppers in new product/process introduction scenarios | en_US |
| dc.type | Article | en_US |
| dc.identifier.doi | 10.1080/00207540802577920 | en_US |
| dc.identifier.journal | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH | en_US |
| dc.citation.volume | 48 | en_US |
| dc.citation.issue | 6 | en_US |
| dc.citation.spage | 1835 | en_US |
| dc.citation.epage | 1852 | en_US |
| dc.contributor.department | 工業工程與管理學系 | zh_TW |
| dc.contributor.department | Department of Industrial Engineering and Management | en_US |
| dc.identifier.wosnumber | WOS:000272988900015 | - |
| dc.citation.woscount | 6 | - |
| Appears in Collections: | Articles | |
Files in This Item:
If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.

