标题: Using bi-level programming to analyze the royalty for private-public partnership projects: the operational quantity-based model
作者: Kang, Chao-Chung
Feng, Cheng-Min
Kuo, Chiu-Yen
运输与物流管理系
注:原交通所+运管所

Department of Transportation and Logistics Management
关键字: BOT project;royalty;negotiation;bi-level programming
公开日期: 2010
摘要: This paper develops a royalty negotiation model based on the operating quantity of Build, Operate, and Transfer (BOT) projects for both government and the private sector using a bi-level programming (BLP) approach. The royalty negotiation is one of many critical negotiation items of a concession contract. This study develops a royalty negotiation model to simulate the negotiation behavior of two parties, and derives the heuristic algorithm for the BLP problem. A number of factors are incorporated into this algorithm including the concession rate, the time value discount rate, the learning rate, and the number of negotiations. The paper includes a case study of the Taipei Port Container Logistic BOT Project. The results show that the two parties involved completed royalty negotiation at the sixth negotiation stage. The findings show that the government can receive a royalty from the concessionaire, calculated at 0.00386% of the operating quantity of this BOT project. Therefore, the royalty negotiation model developed here could be employed to explain negotiation behavior.
URI: http://hdl.handle.net/11536/6286
http://dx.doi.org/10.1080/03081061003732383
ISSN: 0308-1060
DOI: 10.1080/03081061003732383
期刊: TRANSPORTATION PLANNING AND TECHNOLOGY
Volume: 33
Issue: 3
起始页: 315
结束页: 328
显示于类别:Articles


文件中的档案:

  1. 000277659800005.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.