Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Chiou, Chie-Wun | en_US |
dc.contributor.author | Wu, Muh-Cherng | en_US |
dc.date.accessioned | 2014-12-08T15:08:22Z | - |
dc.date.available | 2014-12-08T15:08:22Z | - |
dc.date.issued | 2009-11-01 | en_US |
dc.identifier.issn | 0957-4174 | en_US |
dc.identifier.uri | http://dx.doi.org/10.1016/j.eswa.2009.03.064 | en_US |
dc.identifier.uri | http://hdl.handle.net/11536/6486 | - |
dc.description.abstract | This paper presents a scheduling algorithm for an in-line stepper in low-yield scenarios, which mostly appear in cases when new process/production is introduced. An in-line stepper is a bottleneck machine in a semiconductor fab. Its interior comprises a sequence of chambers, while its exterior is a dock equipped with several ports. The transportation unit for entry of each port is a job (a group of wafers), while that for each chamber is a piece of wafer. This transportation incompatibility may lead to a capacity-loss, in particular in low-yield scenarios. Such a capacity-loss could be alleviated by effective scheduling. The proposed scheduling algorithm, called GA-Tabu, is a combination of a genetic algorithm (GA) and a tabu search technique. Numerical experiments indicate that the GA-Tabu algorithm outperforms seven benchmark ones. In particular, the GA-Tabu algorithm outperforms a prior GA both in solution quality and computation efforts. (C) 2009 Elsevier Ltd. All rights reserved. | en_US |
dc.language.iso | en_US | en_US |
dc.subject | Scheduling | en_US |
dc.subject | Semiconductor | en_US |
dc.subject | Flow shop | en_US |
dc.subject | Port capacity constraints | en_US |
dc.subject | Meta-heuristic algorithm | en_US |
dc.subject | Genetic algorithm | en_US |
dc.subject | Tabu search | en_US |
dc.title | A GA-Tabu algorithm for scheduling in-line steppers in low-yield scenarios | en_US |
dc.type | Article | en_US |
dc.identifier.doi | 10.1016/j.eswa.2009.03.064 | en_US |
dc.identifier.journal | EXPERT SYSTEMS WITH APPLICATIONS | en_US |
dc.citation.volume | 36 | en_US |
dc.citation.issue | 9 | en_US |
dc.citation.spage | 11925 | en_US |
dc.citation.epage | 11933 | en_US |
dc.contributor.department | 工業工程與管理學系 | zh_TW |
dc.contributor.department | Department of Industrial Engineering and Management | en_US |
dc.identifier.wosnumber | WOS:000268270600058 | - |
dc.citation.woscount | 2 | - |
Appears in Collections: | Articles |
Files in This Item:
If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.