完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.author | Hsu, Hsi-Mei | en_US |
dc.contributor.author | Su, Tai-Sheng | en_US |
dc.contributor.author | Wu, Muh-Cherng | en_US |
dc.contributor.author | Huang, Liang-Chuan | en_US |
dc.date.accessioned | 2014-12-08T15:08:39Z | - |
dc.date.available | 2014-12-08T15:08:39Z | - |
dc.date.issued | 2009-10-01 | en_US |
dc.identifier.issn | 0360-8352 | en_US |
dc.identifier.uri | http://dx.doi.org/10.1016/j.cie.2009.01.014 | en_US |
dc.identifier.uri | http://hdl.handle.net/11536/6633 | - |
dc.description.abstract | This study examines a multiple lot-sizing problem for a single-stage production system with an interrupted geometric distribution, which is distinguished in involving variable production lead-time. In a finite number of setups, this study determined the optimal lot-size for each period that minimizes total expected cost. The following cost items are considered in optimum lot-sizing decisions: setup cost, variable production cost, inventory holding cost, and shortage cost. A dynamic programming model is formulated in which the duration between current time and due date is a stage variable, and remaining demand and work-in-process status are state variables. This study then presents an algorithm for solving the dynamic programming problem. Additionally, this study examines how total expected costs of optimal lot-sizing decisions vary when parameters are changed. Numerical results show that the optimum lot-size as a function of demand is not always monotonic. (C) 2009 Elsevier Ltd. All rights reserved. | en_US |
dc.language.iso | en_US | en_US |
dc.subject | Lot-sizing | en_US |
dc.subject | Interrupted geometric distribution | en_US |
dc.subject | Dynamic programming | en_US |
dc.subject | Production lead-time | en_US |
dc.subject | Production/inventory system | en_US |
dc.title | Multiple lot-sizing decisions with an interrupted geometric yield and variable production time | en_US |
dc.type | Article | en_US |
dc.identifier.doi | 10.1016/j.cie.2009.01.014 | en_US |
dc.identifier.journal | COMPUTERS & INDUSTRIAL ENGINEERING | en_US |
dc.citation.volume | 57 | en_US |
dc.citation.issue | 3 | en_US |
dc.citation.spage | 699 | en_US |
dc.citation.epage | 706 | en_US |
dc.contributor.department | 工業工程與管理學系 | zh_TW |
dc.contributor.department | Department of Industrial Engineering and Management | en_US |
dc.identifier.wosnumber | WOS:000273938000007 | - |
dc.citation.woscount | 1 | - |
顯示於類別: | 期刊論文 |