标题: | 多种生产周期时间产品之定价策略 An IC Foundry Pricing Strategy for Multiple Cycle Time Services |
作者: | 陈木宛煜 Wan-Yu Chen 许锡美 Hsi-Mei Hsu 工业工程与管理学系 |
关键字: | 晶圆代工厂;多种生产周期时间;定价;IC Foundry;Multiple Cycle Time;Price |
公开日期: | 2001 |
摘要: | 晶圆代工厂中,顾客对产品交期之急迫性有不同的需求。交期急迫性的订单,以往皆以紧急插单方式进入生产线,此种插单方式会造成生产线的管理失序,且代工厂往往不知其代价。本研究将顾客对多种生产周期时间产品之需求纳入接单管理之规划,进而探讨不同生产周期时间产品对产出及生产周期时间的影响,将此影响反映在相对价格上。 本研究在产品组合给定的情况下,发展系统化的方法订定各种产品合理的生产周期时间及其产出;另考虑插入短生产周期时间产品对生产绩效之影响,并订定各种生产周期时间产品之相对价格。 This research proposes that IC foundries can provide multiple cycle time product service in order to meet the customer requirements. Multiple cycle time product service is that, wafer lots are assigned different committed manufacturing cycle time based on customer’s demands. For example, wafer lots are groups into three classes: shorter cycle time lots, regular cycle time lots, and longer cycle time lots. Customers can place their orders with a particular cycle time and price. Based on this idea, this research proposes a systematic approach to determine various committed cycle time and the corresponding relative prices. This research uses the APS software, Adexa MCP, and the semiconductor manufacturing line simulator, ASAP, to determine the appropriate level of throughput and the reasonable committed cycle time with a given product-mix. Then, we use ASAP to analyze the impact of different percentage of shorter cycle time lots on the following cases: (1) the decrease of throughput with the given committed cycle time and a given delivery rate; and (2) with the given throughput, the decrease of lots that are made within the committed cycle time. Then we define a new committed manufacturing cycle time with that a given delivery rate can be satisfied. Based on these impacts, we can define the relative prices among various cycle time products. |
URI: | http://140.113.39.130/cdrfb3/record/nctu/#NT900031038 http://hdl.handle.net/11536/68158 |
显示于类别: | Thesis |