標題: | Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory |
作者: | Kuo, Tsai-Chi Chang, Sheng-Hung Huang, Shang-Nan 工業工程與管理學系 Department of Industrial Engineering and Management |
關鍵字: | Aggregated time buffer;Due-date control;On-time delivery;Wafer fabrication;Theory of constraints |
公開日期: | 1-三月-2009 |
摘要: | Due-date performance is one of the most important production indexes for success utilized by wafer fabrication factories. Traditionally, the industry sets a Specific due-date tightness level and it dispatching rule based on the total processing time, the production capacity. pre-defined order release criteria and historical data, to ensure deliveries are made on-time. However, such policies typically do not solve the due-date performance problem at wafer fabrication factories, since the processes are highly complex. This investigation explores the due-date performance problem using the concept of the aggregated time buffer in critical chain project management (CCPM), which wits developed by Dr. Goldratt. A simulation model was constructed and the performance of the proposed method is evaluated based on four dispatching rules at a wafer fabrication factory. The findings reveal that applying aggregated time buffer control system improved the overall due-date control. in terms of on-time delivery rate, average tardiness, and variances in average tardiness and lateness, (C) 2008 Elsevier Ltd. All rights reserved. |
URI: | http://dx.doi.org/10.1016/j.eswa.2007.12.038 http://hdl.handle.net/11536/7539 |
ISSN: | 0957-4174 |
DOI: | 10.1016/j.eswa.2007.12.038 |
期刊: | EXPERT SYSTEMS WITH APPLICATIONS |
Volume: | 36 |
Issue: | 2 |
起始頁: | 1783 |
結束頁: | 1792 |
顯示於類別: | 期刊論文 |