Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Wu, M-C | en_US |
dc.contributor.author | Huang, L-C | en_US |
dc.contributor.author | Hsu, H-M | en_US |
dc.contributor.author | Su, T-S | en_US |
dc.date.accessioned | 2014-12-08T15:11:29Z | - |
dc.date.available | 2014-12-08T15:11:29Z | - |
dc.date.issued | 2011-06-01 | en_US |
dc.identifier.issn | 0160-5682 | en_US |
dc.identifier.uri | http://dx.doi.org/10.1057/jors.2010.39 | en_US |
dc.identifier.uri | http://hdl.handle.net/11536/8807 | - |
dc.description.abstract | In a production system with random yield, it may be more cost effective to release lots multiple times towards fulfilling a customer order. Such a decision, called the multiple lot-sizing problem, has been investigated in various contexts. This paper proposes an efficient algorithm for solving a new multiple lot-sizing problem defined in the context of a two-stage production system with non-rigid demand when its process yields are governed by interrupted geometric distributions. We formulate this problem as a dynamic program (DP) and develop lemmas to solve it. However, solving such a DP may be computationally extensive, particularly for large-scale cases with a high yield. Therefore, this study proposes an efficient algorithm for resolving computational issues. This algorithm is designed to reduce the DP network into a much simpler algorithm by combining a group of DP branches into a single one. Extensive experiments were carried out. Results indicate that the proposed reduction algorithm is quite helpful for practitioners dealing with large-scale cases characterized by high-yield. Journal of the Operational Research Society (2011) 62, 1075-1084. doi: 10.1057/jors.2010.39 Published online 19 May 2010 | en_US |
dc.language.iso | en_US | en_US |
dc.subject | lot-sizing | en_US |
dc.subject | interrupted geometric distribution | en_US |
dc.subject | dynamic programming | en_US |
dc.subject | two-stage system | en_US |
dc.subject | production/inventory system | en_US |
dc.title | Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand | en_US |
dc.type | Article | en_US |
dc.identifier.doi | 10.1057/jors.2010.39 | en_US |
dc.identifier.journal | JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY | en_US |
dc.citation.volume | 62 | en_US |
dc.citation.issue | 6 | en_US |
dc.citation.spage | 1075 | en_US |
dc.citation.epage | 1084 | en_US |
dc.contributor.department | 工業工程與管理學系 | zh_TW |
dc.contributor.department | Department of Industrial Engineering and Management | en_US |
dc.identifier.wosnumber | WOS:000290179400014 | - |
dc.citation.woscount | 3 | - |
Appears in Collections: | Articles |
Files in This Item:
If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.