<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css"> Skip to main content

Multiple lot-sizing decisions with an interrupted geometric yield and variable production time

Loading...
Thumbnail Image

Journal Title

Journal ISSN

Volume Title

Publisher

DOI

10.1016/j.cie.2009.01.014

Abstract

This study examines a multiple lot-sizing problem for a single-stage production system with an interrupted geometric distribution, which is distinguished in involving variable production lead-time. In a finite number of setups, this study determined the optimal lot-size for each period that minimizes total expected cost. The following cost items are considered in optimum lot-sizing decisions: setup cost, variable production cost, inventory holding cost, and shortage cost. A dynamic programming model is formulated in which the duration between current time and due date is a stage variable, and remaining demand and work-in-process status are state variables. This study then presents an algorithm for solving the dynamic programming problem. Additionally, this study examines how total expected costs of optimal lot-sizing decisions vary when parameters are changed. Numerical results show that the optimum lot-size as a function of demand is not always monotonic. (C) 2009 Elsevier Ltd. All rights reserved.

Description

Citation

Endorsement

Review

Supplemented By

Referenced By