<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css"> Skip to main content

Real-Option Valuation of Build- Operate-Transfer Infrastructure Projects under Performance Bonding

Loading...
Thumbnail Image

Journal Title

Journal ISSN

Volume Title

Publisher

DOI

10.1061/(ASCE)CO.1943-7862.0000821

Abstract

This study assesses the effect of performance bonding on the valuation of a build-operate-transfer (BOT) project by extending the classical Black-Scholes-Merton (BSM) call option model. As common features in BOT contracts, a performance bond is a penalty imposed on concessionaires who exercise contractual rights to terminate participation in a project. In the real-option context, termination rights grant concessionaires the flexibility in managing market uncertainties that can increase the valuation of an infrastructure project, but the penalty impairs this flexibility and reduces valuations. A case study numerically illustrates the BSM model and indicates that performance bonding can destroy the flexibility and project valuations inherent in termination rights even when the penalty is moderate. Balancing performance bonds and termination rights is necessary because both are important in establishing and maintaining long-term contractual relationships in privatized BOT infrastructure projects.

Description

Citation

Endorsement

Review

Supplemented By

Referenced By