Full metadata record
DC FieldValueLanguage
dc.contributor.authorWang, Shih-Hsuen_US
dc.contributor.authorLai, Yu-Tingen_US
dc.contributor.authorLiu, Jang-Jengen_US
dc.contributor.authorWang, Wei-Chihen_US
dc.date.accessioned2017-04-21T06:48:42Z-
dc.date.available2017-04-21T06:48:42Z-
dc.date.issued2014en_US
dc.identifier.isbn978-3-03785-947-6en_US
dc.identifier.issn1660-9336en_US
dc.identifier.urihttp://dx.doi.org/10.4028/www.scientific.net/AMM.479-480.1160en_US
dc.identifier.urihttp://hdl.handle.net/11536/135276-
dc.description.abstractMany probabilistic scheduling models have been developed to determine the duration of construction projects. However, these models are not appropriate to capture the effect of the factors that are involved construction interface problems on the durations of multiple activities. This work presents a simulation-based probabilistic scheduling model that includes the impact of construction interface problems on the duration of building projects. The proposed model is established according to an activity duration model and a work-group (WG)-based schedule network. The activity duration model is applied to reflect the effects of "general factors" on the duration of each activity; the WG-based schedule network is employed to evaluate the effects of construction interface problems on the durations of multiple activities. The results of applying the proposed model to an example project reveal that the duration of a project can be over-optimistically estimated if the effects of construction interface problems are neglected.en_US
dc.language.isoen_USen_US
dc.subjectConstruction interfaceen_US
dc.subjectuncertain durationen_US
dc.subjectsimulationen_US
dc.subjectprobabilistic schedulingen_US
dc.subjectschedule risk managementen_US
dc.titleModel for evaluating uncertain project duration considering construction interface problemsen_US
dc.typeProceedings Paperen_US
dc.identifier.doi10.4028/www.scientific.net/AMM.479-480.1160en_US
dc.identifier.journalAPPLIED SCIENCE AND PRECISION ENGINEERING INNOVATION, PTS 1 AND 2en_US
dc.citation.volume479-480en_US
dc.citation.spage1160en_US
dc.citation.epage+en_US
dc.contributor.department土木工程學系zh_TW
dc.contributor.departmentDepartment of Civil Engineeringen_US
dc.identifier.wosnumberWOS:000337850800219en_US
dc.citation.woscount0en_US
Appears in Collections:Conferences Paper